Building Condition Survey: Gayrettepe to Third Airport Metro Line Corridor
Project: Building Condition Survey: Gayrettepe – Third Airport Metro Line Corridor
Project Duration: 2017
Project Extent: Corridor of Gayrettepe – Third Airport Metro Line
Project Participants: Kolin-Kalyon-Cengiz, GRM
Scope of Project: The condition of all buildings found in the corridor of the Gayrettepe – Third Airport Metro Line was determined and recorded prior to construction of the metro line.